View Single Post
  #35  
Old 06-09-2019, 11:41 PM
Still-One Still-One is offline
Guest
 
Join Date: Apr 2009
Location: Milford, MI
Posts: 32,465
Default

I received the long optical run this afternoon so I was able to replace the long Ethernet cable and move the opticalModule close to the dCS Upsampler. I will probably pick up a better short cable for that last .75 meter between the module and upsampler.

What really surprised me was how hot both the opticalModule and its power supply were as I disconnected them for the move from upper to lower levels. That is by far the hottest any piece of my gear has been.
Reply With Quote